ENGINEERING
From idea to startup
After a thorough analysis of your question or problem, we can develop an appropriate solution in our engineering departments.
Electric tracing
- We evaluate which heating cable, tracing type, and accessories are most suitable for your situation/question.
- Taking into account all peripheral factors in relation to heat losses and conditions, as well as the construction of the installation with maintenance in mind.
- Working according to the provided specification
- Design/process-oriented construction
- Product selection
- HeatTracer HeatTracer is not dependent on suppliers.
- We always go for the right supplier for your question and process if no specification is available.
- The control can range from standard on/off to solid-state controlled circuits.
- For controls, operational expenditure (OPEX) savings are always considered.
- ATEX environments
- Thermal insulation
- Drawn isometrics
- Documentation/as-built
Steam Tracing & Instrumentation Tubing
- Developing the correct tubing (copper, stainless steel, flex) for the desired application.
- Designing and drawing manifolds, steam traps, tails, and leads
- Circuit calculations
- Determining and drawing routings for
- Control air, control valves, and actuators
- Pressure and differential pressure measurements
- Transmitter cabinets
- Etc.
E&I
- We gladly include the complete electrical part in the engineering as well as the execution.
- Determining the appropriate control
- Control and monitoring
- Voltage/working voltage – Single-phase/Three-phase – 230V – 400V
- The necessary power per circuit and total are provided.
- Designing control and power panels
- Cable route planning
- Providing cable calculations (power)
- E-Plan diagrams
- Documentation/as-built
Work Preparation
- During shutdowns or turnarounds, we have the necessary know-how to create the necessary work packages in preparation for the downtime.
- A wall chart/plan of approach is always included to ensure smooth operations, coordinated with other contractors.
- Good preparation saves time and money during the turnaround.